JFD conducts hydrostatic pressure test
Read article
Services included installation of messenger lines to 51 turbines and completion of cable installations, recording cable lay operations from the DPII vessel and activating the Tekmar cable seal systems.
Summary
Walney I and II both comprise 51 wind turbines with a total capacity of 367.2MW. The development includes foundations, turbines, export and array cables, offshore substations and onshore connection to grid.
Who:
Visser and Smit Marine Contracting (VSMC)
Services provided:
Benefits delivered:
Download the Walney II wind farm, diving and ROV case study.