German contractor Detlef Hegemann uses Prolec’s pcX-3D system on its Liebherr 984 excavator during a large scale salvage operation in Barcelona. 

The operation involved removing sediment and material from within tubes, each measuring 3.5 meters in diameter and around 17 meters in length, which were housed in submerged concrete segments. For this task, the contractor, Detlef Hegemann, used a Liebherr 984 excavator equipped with a special DOP pump, which was operated from a pontoon barge.

Being submerged, the tubes were difficult to locate and the subsequent task of positioning the DOP pump within the tube without damaging the concrete segments was extremely difficult and time consuming. External guidance could make the job simpler and more efficient.

Installing pcX-3D solved this particular problem by giving the operator a 3D view of each tube relative to the tool position. This enabled the operator to accurately position the pump inside the tube and extract the material without damaging the machine, the concrete segments or the tubes.

The system was installed using high quality marine grade AS8 and AS9 sensors, and the software was customised to include a DOP tool attachment. A DTM of the job site showing each concrete tube location was loaded into pcX-3D.

Summary

German company Detlef Hegeman uses Prolec’s pcX-3D system on its Liebherr 984 excavator, with high quality marine grade AS8 and AS9 sensors in the large scale El Prat quay salvage development.

Who:
Detlef Hegemann

Services provided:

  • Installation of Prolec’s pcX-3D system
  • AS8 and AS9 marine grade sensors
  • Installation and customised software, including a DOP tool attachment
  • Customer specified, 23" computer screen was installed rather than the standard 15" screen

Benefits delivered:

  • Installation of pcX-3D gives the operator a 3D view of each tube relative to the tool position
  • Improved operator accuracy to position the pump inside tube and extract materials without damaging equipment
  • Customer received a system customised to their exact requirements

Download the Habour reclamation case study.